BALTIC MONITOR

NordBalt HVDC power link between Lithuania and Sweden disconnected and restored, corroborated by 3 sources

NordBalt HVDC converter station, Lithuania · started · last report · 4 reports from 3 independent sources

The NordBalt link disconnected Friday afternoon due to a converter fault and was restored after Swedish grid operator inspection of the 400 kV switchyard.

Corroborated by 3 sources

Independent sources report it; no official body has confirmed it yet.

Incidents

The incidents in this story, each with how sure it is in the board's words.

The NordBalt electricity link between Lithuania and Sweden disconnected on Friday afternoon

Lithuania's electricity transmission system operator Litgrid reports that the NordBalt electricity link between Lithuania and Sweden disconnected on Friday afternoon.

What
infrastructure
Where
NordBalt converter station, Klaipėda, Lithuania
When it happened
How sure
reported by 3 independent sources
Severity
4 of 5, serious
First reported by
LRT Lithuanian (a newsroom),
Corroborated by
Lrytas (a newsroom),
What would settle it
The Lithuanian army's or the National Crisis Management Centre's statement would settle it.

Developments

  • : TV3 reported the disconnection was caused by a converter station fault on the Swedish side.

Show it on the live board

Reports, newest first

Each report with its source. Our English title links to the report; where the source has its own headline, it is quoted in its language.

  1. · TV3.lt (all news), a newsroom
    NordBalt power link with Sweden disconnected
    Headline: Atsijungė „NordBalt“ elektros jungtis su Švedija
  2. · Lrytas, a newsroom
    NordBalt power link with Sweden disconnected: what happened
    Headline: Atsijungė „NordBalt“ elektros jungtis su Švedija: kas atsitiko
  3. · LRT Lithuanian, a newsroom
    NordBalt electricity link with Sweden restored
    Headline: „NordBalt“ elektros jungtis su Švedija vėl veikia
  4. · LRT Lithuanian, a newsroom
    NordBalt electricity link with Sweden disconnected
    Headline: Buvo atsijungusi „NordBalt“ elektros jungtis su Švedija

See also

How this page is made: the reports are the ones the board collects, grouped into one story by rules, each with its source named and linked. The title and summary are written by a language model and checked against their sources by rule; how sure each incident is comes from fixed rules, never from a model.